Project Scope
Rope Access Construction
Project Challenges
- Working in a vertical shaft
- Not disrupting rail traffic
- Site Access
This Rope Access project required BAT Construction crews access the CN Thornton ventilation tunnel to assist in the safe demolition of a cable tray and subsequent installation of additional cabling that was lowered into the shaft.
This was a short duration project for BAT.