Projects
Tulameen Bluffs Blasting
BAT Construction was contracted to provide specialized drilling and blasting services for rip-rap production near Tulameen, BC, supporting regional road maintenance and slope stabilization. The project covered two main locations: the Tulameen Quarry Expansion and the Tulameen Bluffs. BAT’s scope included site mobilization, clearing, stripping, and drilling and blasting approximately 20,800 cubic meters of rock.
Read More
Kiewitt Coquihalla Stabilization
BAT Construction was engaged as a subcontractor to perform temporary geohazard mitigation services for the Trans Mountain Expansion Project. The scope of work included slope scaling, the installation of both upslope and downslope mesh systems, anchoring, and the preparation of access routes for inspection purposes. Additionally, targeted spot meshing and anchoring were carried out along access roads to enhance overall site stability.
Read More
CIF S50 Bolting and Shotcrete
BAT Construction delivered rock stabilization for the Hwy 1 Chase West project, installing 3,200m of rock bolts and 600m³ of shotcrete to support over 25,000m³ of excavation—ensuring safety and performance on this vital BC highway upgrade.
Read More
Jaleslie Siding Extension
BAT Construction was subcontracted by EllisDon/PME, under the ownership of Canadian National Railway (CN), to perform specialized earth retention and stabilization work for the CN Ashcroft Subdivision Mile 17.7 to 18.8 Jaleslie Siding Extension project. This critical infrastructure project required advanced geotechnical solutions within a tightly constrained rail corridor.
Read More
Big White Slope Repair
Project Scope BAT Construction successfully delivered the Big White Road Slope Remediation Project near the Kettle River Bridge, in coordination with Aim Roads, Ecora Engineering, and the BC Ministry of…
Read More
City Gardens Shoring
Project Scope BAT Construction was contracted by Kelson Group Developments to deliver specialized shoring services for the City Gardens residential development in Kamloops, BC. The scope of work included the…
Read More
Three Valley Gap Bluffs, Rockfall Attenuator System
Project Scope BAT Construction was contracted by the BC Ministry of Transportation and Infrastructure (MoTI) to deliver critical rockfall mitigation measures along a high-risk section of Highway 1 at Three…
Read More
Boulder Breaking and Blasting, Horizontal Drain Hole Drilling, Mine Support Services, Shotcrete and Shoring, Slope Mesh Systems
Highland Valley Copper Mine
BAT Construction supports Highland Valley Copper Mine with several different & diverse services such as Horizontal Drain Hole Drilling (HDH), cable placement, rock scaling, shotcrete, geotechnical work & much more. Crews install 40,000+ L/M of pit drains yearly, aligning with HVC’s safety, budget, and schedules.
Read More